Search across ocean data collections and information systems.
Spectrum Geosurvey Limited was contracted to perform sidescan sonar and multibeam bathymetry surveys on the Westermost Rough offshore wind farm (WMR01). The purpose of the survey programme was to serve as the first of six consent surveys in the operation and maintenance phase of the wind farm’s FEPA...
The Hywind Scotland Wind Power Plant at Buchan Deep is located (at 57.45N, 01.31W) off the eastern coast of Scotland. The water depth is for computation of some metocean parameters assumed to be 100 m. For planning of marine operations and structural analysis the exact depth should be verified. The ...
This report presents a summary of the predicted noise levels likely to occur during installation of monopile foundations at Race Bank and to determine the increase in impact ranges when using various hammer blow energies. In order to estimate the noise levels likely to arise from the installation of...
An oil and gas industry site survey for a semi-submersible rig replacement acquired under licence E439. The block numbers traversed were 15/16, 15/11, 14/20.
An oil and gas industry site survey for a drilling hazard acquired under licence P666 in July 2015. The block number traversed was 22/30.
An oil and gas industry exploration drilling, drilling hazard, jack-up rig site survey acquired under licence P2216 in September 2015. The block numbers traversed were 3/30, 4/26.
An oil and gas industry site survey to establish the geophysical and environmental characteristics, as well as safety risks, prior to decommissioning operations at the 53/3c 9A (Horne) and 53/3c-8 (Wren) platform wells. The survey was acquired under licences P786, P852 in January 2015. The block num...
The Kentish Flats Extension (KFE) Environmental Statement (ES) recognised that there is a slight risk associated with the re-suspension of sediments during cabling works which could lead to increases in bacterial concentrations of the water column resulting from release of sediment bacteria. This Ba...
This Pre-construction Environmental Monitoring Report has been produced in order to discharge Li-cence Condition 12 of Part 2 of Schedule 2 (Deemed Marine Licence under the Marine and Coastal Ac-cess Act 2009) of the Kentish Flats Extension Order 2013. The purpose of this document is to provide an o...
Wessex Archaeology was commissioned by Blyth Offshore Demonstrator Limited to carry out an archaeological assessment of geophysical survey data as part of the pre-construction works being undertaken for Blyth Offshore Wind Farm. The data consisted of sidescan sonar, magnetometer and multibeam bathym...
Showing 9721 to 9730 of 928252 results.