Modus Seabed Intervention was contracted by DONG Energy to conduct pre-installation works on the Burbo Bank Extension offshore wind farm. The workscope was divided into two packages – an initial investigation survey of known ferromagnetic unexploded ordnance (UXO) targets to identify any explosive o...
Post construction fish surveys are required to investigate changes in the fish and commercial shellfish populations in and around the TOWF site. The findings will be used for comparison with pre-construction surveys carried out in 2010 in order to assess the potential of the wind farm to act in enha...
An oil and gas industry debris clearance, drilling hazard, environmental, semi-sub rig site survey acquired under licence P2062 in June 2015. The block numbers traversed were 205/15, 206/11.
An oil and gas industry debris clearance, environmental, semi-sub rig site survey acquired under licence P185 in June 2015. The block number traversed was 15/22.
Underwater noise monitoring was undertaken before and during piling operations at the Kentish Flats Extension (KFE) Wind Farm, UK. Piling operations were performed by GeoSea and IHC Hydrohammer BV on behalf of Vattenfall Wind Power Ltd, between 2nd and 24th May 2015. Ocean Science Consulting (OSC) L...
Underwater noise monitoring was undertaken before and during piling operations at the Kentish Flats Extension (KFE) Wind Farm, UK. Piling operations were performed by GeoSea and IHC Hydrohammer BV on behalf of Vattenfall Wind Power Ltd, between 2nd and 24th May 2015. Ocean Science Consulting (OSC) L...
Osiris Projects were commissioned in January 2015 by DONG Energy to carry out a geophysical and UXO survey at the planned Burbo Bank extension Offshore Windfarm site. The survey was completed under Osiris Projects Terms and Conditions. The main site survey, the northern section of the export route a...
Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in order to monitor the seabed state, specifically the identification of seabed debris and scour or sediment accretion...
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a Multibeam Echosounder (MBES) survey at the Gunfleet Sands 3 Offshore Windfarm in the Thames Estuary. The scope of work, for the June 2015 survey included: 1. MBES survey of 50m wide corridor al...
In May 2015, Triton Knoll Offshore Wind Farm Limited contracted Precision Marine Survey Limited (PMSL) to supply a suitable guard vessel to assist the geophysical and geotechnical investigations within the Triton Knoll Offshore Wind Farm (TKOWF) development envelope. The deployment of a guard vessel...