Fugro Seacore Limited was contracted to BOWL to carry out a ground investigation at the Beatrice Offshore Wind Farm site. The investigation was carried out along the proposed export cable route to identify the geotechnical conditions at the site and to provide information that would assist the Cl...
Fugro EMU Limited (Fugro EMU) was commissioned by Dong Energy (the Client) to undertake an asset inspection survey of Barrow Offshore Windfarm (BOW01) array and inter-array cables. The survey area was situated in Morecambe Bay, approximately 25 km west of Heysham. The survey utilised two Fugro owned...
The Beatrice Offshore Windfarm Project commissioned UXO surveys of numerous locations across the offshore site in order to provide confidence that no UXO objects existed prior to undertaking a geotechnical survey campaign. The UXO surveys were undertaken in 2013, 2014 and 2015 and covered likely ...
Gardline Geosurvey Limited carried out a geophysical survey for Triton Knoll Offshore Wind Farm Limited (TKOWFL) situated 33km off the coast of Grimsby covering an area of 143km². The proposed survey consisted of an Unexploded Ordnance (UXO) survey over 18 proposed borehole locations, an Ultra-High ...
Gardline Geosurvey Limited carried out an export cable route survey for DONG Energy Wind Power AS extending from the Hornsea Project One Wind Turbine Area to landfall at the Lincolnshire coast. The object was to gather information strictly along newly designed export cable routes where the existing ...
Blyth Offshore Demonstrator Limited has contracted Geo to conduct a geotechnical site investigation at six turbine locations of Array 2 and along an export cable route for the Blyth Offshore Demonstrator Project. The geotechnical site investigation consists of: seabed cone penetration test with pore...
This monitoring summary report has been prepared by DONG Energy as part of the Marine Licence monitoring program for the Gunfleet Sands I & II Offshore Wind Farm, under Marine Licences L/2011/00064/9 and L/2011/00065/3 respectively. This report describes the environmental monitoring completed du...
This monitoring summary report has been prepared by DONG Energy as part of the Marine Licence monitoring program for the Gunfleet Sands 3 Demonstration Project, under Marine Licence L/2012/00100/7. This report describes the environmental monitoring completed during the first year post construction p...
Post construction survey 2015 for Humber Gateway Offshore Wind Farm conducted by Harkand Andrews Survey between 17 March - 28 May 2015. The extent of the areas covered by the post construction site survey are as follows: - Array Cables: the array cables were surveyed in 15m wide corridors, using t...
This report builds on a pre-construction survey conducted in 2013 and aims to address data deficiencies in the understanding of the impacts of OWF construction on the key commercial crustacean species Homarus gammarus, Cancer pagurus and Necora puber. The survey design used the before/after, control...