This report presents results of the surveys in and around West of Duddon Sands in 2015, which represent the first post-construction survey year, following pre-construction (baseline) surveys carried out in 2012 and during-construction surveys in 2013 and 2014. Some comments on the results are provid...
An oil and gas industry drilling hazard site survey acquired under licences P119, P103, P213 between July and October 2015. The block numbers traversed were 15/28a, 15/28c, 15/28d, 15/28e.
An oil and gas industry seabed infrastructure, semi-sub rig, environmental site survey acquired between March and April 2015. The block numbers traversed were 13/22, 13/17.
The document within this series provides additional evidence in relation to the burial depth of the array and export cables at the Westermost Rough Offshore Wind Farm, and the potential effects of a reduction in burial from the electromagnetic fields that are produced from them during operation. The...
In June 2015, EDF Energy Renewables (EDF) contracted EGS International Ltd (EGSi), supported by Benthic Solutions Limited (BSL) to undertake a pre-construction geophysical, bathymetric and Annex I habitat survey within the Blyth Offshore Demonstrator Site. The objective of the benthic survey was to ...
In June 2015, EDF Energy, Renewables (EDF) contracted EGS International Ltd (EGSi) to undertake a pre-construction geophysical, bathymetric and Annex I habitat survey within the Blyth Offshore Demonstrator Site. The objective of the geophysical survey was: “to act as reconnaissance survey to determi...
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake a hydrographic, geophysical and UXO survey within the area of the Docking Shoal Meteorological Mast. A jack-up vessel will be used to remove the decommissioned Met Mast on Docking Shoal, with the pl...
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around around WTGs LS28 (on the Lincs site) and WTGs ID16 and ID24 on the Inner Dowsing Site which is located in the southern North Se...
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around WTGs ID16 and ID24 on the Inner Dowsing Site which is located in the southern North Sea, approximately 5km off the coast of Lin...
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic survey was required f...