An oil and gas industry drilling hazard, debris clearance site survey acquired under licences P092, P110 in July 2015. The block numbers traversed were 16/28,16/29.
An oil and gas industry drilling hazard, debris clearance site survey acquired under licence P363 between August and October 2015. The block number traversed was 30/1.
Bibby HydroMap were commissioned in October 2015 by E.ON to carry out rock bag post installation survey using a high resolution multibeam system at the Humber Gateway Offshore Wind Farm. The survey was carried out between 3rd October 2015 and 6th October 2015. The main objective of the survey was th...
Bibby HydroMap were commissioned in September 2015 by EDF Energy Renewables to carry out geophysical and high-resolution bathymetric surveys of Teesside Offshore Wind Farm (OWF) as part of ongoing monitoring of the site. The surveys were carried out between 8th and 22nd September 2015. The main obje...
Bibby HydroMap were commissioned in April 2015 by DONG Energy to carry out a geophysical survey on a selection of areas located in the Walney Offshore Windfarm (WOW), and a bathymetric survey on the West of Duddon Sands (WoDS) windfarm. The survey comprises of mapping the seabed surrounding the off...
This project was initiated following discussions between BGS and The Crown Estate (TCE) in the light of data from the proposed Round 3 offshore wind farm (OWF) (Celtic Array) being provided to the TCE following the return of the Round 3 licence. TCE make data from marine activities publicly availabl...
A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 16th and 21st of August 2015. The survey methodology replicated that of the August 2010 pre-installation survey, and the November 2012 and August 2013 post-installation survey. T...
A longline survey was undertaken in the area relevant to the Sheringham Shoal Offshore Wind Farm export cable between the 16th and 21st of August 2015. The objective of the survey was to assess whether the operational export cable has any discernible effects on the localized population of elasmobran...
Environmental monitoring for the Burbo Extension Project, with a specific focus on Habitats Directive (92/43/EEC) Annex I habitat and habitats of conservation or ecological importance in order to satisfy requirements of the two English marine licences (EN010026) and one Welsh licence (13/17/ML). ...
Cathie Associates have been commissioned by DONG Energy to perform a Burial Risk Assessment (BRA) for the inter-array cables and the export cable. The purpose of the BRA is to determine the minimum burial depths required to achieve the protection requirements of the project with regard to natural an...