Search across ocean data collections and information systems.
The report in this series presents a summary of the results obtained during underwater noise monitoring of piling activities at the Westermost Rough Offshore Wind Farm. The aim of the surveys was to monitor the underwater noise radiated from marine pile-driving during the installation of the monopil...
Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. Whiteford Geoservices Ltd were commissioned by Mainstream Renewable Power Limited, on behalf of Neart na Gaoithe Offshore Wind Limited, to ...
King Scallop Shell Widths from Landings in the NEIFCA District
Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, and is owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in order to monitor the seabed state, specifically the identification of seabed debris and scour or sediment ac...
Two sea-bed mount ADCP surveys were undertaken by Applied Renewables Research Ltd (ARR Ltd) within the tidal stream off Fairhead in Northern Ireland. The current and wave measurements were undertaken at different locations using identical Acoustic Doppler Current Profilers (ADCPs) deployed in dedica...
The Herring Larval survey conducted by E.ON was undertaken to characterise herring spawning in the vicinity of the proposed Rampion development area. The survey methodology replicates that of the ICES International Herring Larval Survey. 23 stations were sampled in November 2014, December 2014 and J...
This series consists of two geotechnical reviews undertaken by ChalkRock Ltd. The first is a review of the Chalk borehole cores. As part of the Ground Investigation for the Dudgeon OWF, Rory Mortimore of ChalkRock Ltd was instructed to log the Chalk borehole cores for the Statoil Dudgeon Offshore Wi...
Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a bathymetry and sidescan sonar (SSS) survey of the Sheringham Shoal Offshore Wind Farm and export cables. The survey was required to fulfil Marine Management Organisation (MMO) requirements for post-construc...
Fugro GeoConsulting Limited was contracted to BOWL to perform the geotechnical completion campaign at the Beatrice Offshore Wind Farm site. The geotechnical survey was performed to obtain soils information to assist in the design and installation of wind turbine generators along with the associate...
The Beatrice Offshore Windfarm Project commissioned UXO surveys of numerous locations across the offshore site in order to provide confidence that no UXO objects existed prior to undertaking a geotechnical survey campaign. The UXO surveys were undertaken in 2013, 2014 and 2015 and covered likely ...
Showing 9351 to 9360 of 928252 results.