Search across ocean data collections and information systems.
An oil and gas industry site survey acquired under licence P1330 between September and October 2014. The block numbers traversed were 42/28d, 42/28c, 42/27.
In October 2013 Environmental Scientifics Group (ESG) were commissioned by Dong Energy UK (DONG) to conduct an intertidal geophysical survey over an area of foreshore at Rhyl in Denbighshire. The area to be surveyed is the proposed cable landing point from an extension to the existing Burbo Bank Off...
An oil and gas industry debris clearance, environmental site survey acquired under licence P238 in July 2014. The block number traversed was 21/19.
An oil and gas industry site survey for debris clearance, 2DHR, semi-sub rig, ROV inspection acquired under licence P1077 between April and June 2014. The block number traversed was 9/2b.
In April 2014 Environmental Scientifics Group (ESG) were commissioned by DP Energy Ireland Ltd to carry out a geological desk study and also conduct a hydrographic and geophysical survey over the proposed Fair Head Tidal Energy Site and cable route options. The geological desk study was required to ...
At the request of DONG Energy Burbo Extension (UK) Limited. (DONG), Fugro Alluvial Offshore Limited (FAOL) were contracted to perform a geotechnical site investigation. The investigation was to aid in the development of the extension to the Burbo Bank offshore wind farm. The shallow geotechnical sit...
The objectives of the investigation were as follows: • To provide a magnetic survey to identify any potential UXO prior to further data acquisition • To perform seismic investigations with the purpose of providing an informed basis for the planning of two horizontal directional drillings in orde...
DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators. The export cables will be approximately 38 km long, with the cable landfall at Weybourne Hope. As part of the E...
Fugro EMU Limited (Fugro EMU) was commissioned by Scira Offshore Energy Limited to conduct a bathymetry survey of the Sheringham Shoal Offshore Wind Farm and export cables. The survey was required to fulfil Marine Management Organisation (MMO) requirements for post-construction monitoring. In or...
A ground investigation has been carried out by Fugro Seacore Limited (FSCL) on the instructions of DONG Energy Burbo Bank Extension (UK) Limited (the Client) and under the supervision of Cathie Associates (the Engineer), at Burbo Bank Extension Offshore Wind Farm. The site is located west of the exi...
Showing 9261 to 9270 of 928252 results.