2014 geophysical survey of Kentish Flats Extension wind farm and associated cable corridor. Survey carried out by EGS (International) Ltd. from March to June 2014. Survey includes the following elements: - Magnetometer - SSS - Sub-bottom profiler - MBES. The survey report in this series summarises ...
EGS (International) Ltd, on behalf of Centrica undertook this survey The LINCS Offshore Wind Farm is located 8km off the Lincolnshire coast at Skegness, just north of the North Sea area known as “The Wash”. The total route length of the array cables is 69.68km with the two export cables measuri...
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2014 post construction hydrographic and geophysical surveys of the Lincs windfarm and export cable routes. And 2014 post construction environmental benthic survey of the Lincs offshore windfarm ...
After completion of the depth of burial survey of the Lincs Array Cables project, and the Export Cable survey, EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and Multibeam (MBES) clearance survey of the no cable zones (500m by 500m) around WTGs LS28 (on the Linc...
The London Array Offshore Wind Farm (OWF) is situated approximately 20 kilometres (km) to the northeast of the Kent coast, within the “Knock Deep” Channel of the Thames Estuary. The OWF consists of 175 Wind Turbine Generators (WTGs) and 2 substations. The export cable route, consisting of four cable...
The London Array Offshore Wind Farm (OWF) is situated approximately 20 kilometres (km) to the northeast of the Kent coast, within the “Knock Deep” Channel of the Thames Estuary. The OWF consists of 175 Wind Turbine Generators (WTGs) and 2 substations. The export cable route, consisting of four cable...
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2014 post-construction hydrographic and geophysical surveys of the Lincs and L and ID (Lynn and Inner Dowsing) windfarms and export cable routes, which are located in the southern North Sea, app...
In September 2014, DONG Energy contracted EGS International Ltd (EGSi) to undertake a preconstruction geological survey along specified segments of the Inter-array cables (IAC) which have not been previously surveyed at the planned Race Bank offshore wind farm site. The geological survey aims to ...
In September 2014 EGS (International) Ltd was contracted to undertake the post construction (6 month) survey of the Barrow and Walney OWFs and export cables.
EGS International Ltd (EGSi) were contracted to undertake a post-construction survey of a number of selected turbines, one substation and several array cables within WOW 1 & 2. The aim of the survey was to assess the extent of any changes to seabed and scouring around the turbine monopile...