Search across ocean data collections and information systems.
Aerial bird survey conducted over the Ormonde wind farm and adjacent areas in order to fulfil conditions set out in the project Marine Licence (L/2011/00201/10). The survey work was scheduled to occur in December (2013) and January (2014). However, due to poor weather conditions, the survey was unde...
Anatec was commissioned by Tidal Ventures Limited (TVL), a joint venture between Bord Gáis Energy and OpenHydro Technology Limited, to perform a shipping and navigation assessment and a preliminary hazard analysis (PHA) of the proposed Torr Head Tidal Energy Array, off the North Antrim coast of Nort...
Anatec was commissioned by Tidal Ventures Limited (TVL), a joint venture between Bord Gáis Energy and OpenHydro Technology Limited, to perform a shipping and navigation assessment and a preliminary hazard analysis (PHA) of the proposed Torr Head Tidal Energy Array, off the North Antrim coast of Nort...
Anatec have been commissioned by Cathie Associates to analyse the shipping and fishing activity in the area surrounding the Walney Extension Offshore Wind Farm and its export cable system, located off the North West coast of England.
Using regulator guidance, this Navigational Risk Assessment (NRA) identifies and analyses both the base case and future case risk associated with the development of Dogger Bank Teesside A & B. Analysis and collision risk modelling was undertaken based on three scenarios as follows: Dogger Bank T...
Using regulator guidance, this Navigational Risk Assessment (NRA) identifies and analyses both the base case and future case risk associated with the development of Dogger Bank Teesside A & B. Analysis and collision risk modelling was undertaken based on three scenarios as follows: Dogger Bank T...
This study forms chapter 14 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). The study was carried out by Anatec Limited and it describes the existing environment with regard to shippi...
This study forms Chapter 14 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). The study was carried out by Anatec Limited and it describes the existing environment with regard to shipping...
An oil and gas industry site survey for a semi-sub rig acquired under licences P103, P1986 in August 2014. The block numbers traversed were 9/18, 9/19.
An oil and gas industry site survey for a semi-sub rig acquired under licences P103, P1986 in August 2014. The block numbers traversed were 9/18, 9/19.
Showing 9211 to 9220 of 928252 results.