Search across ocean data collections and information systems.
Acting on behalf of Statoil Petroleum AS and Dudgeon Offshore Wind Limited, Fugro GEOS Ltd has undertaken a 12-month metocean measurement programme at the Dudgeon Field in the southern North Sea to support wind park development. The Dudgeon mooring consisted of an Oceanor Seawatch Midi buoy con...
Acting on behalf of Statoil Petroleum AS and Dudgeon Offshore Wind Limited, Fugro GEOS Ltd has undertaken a 12-month metocean measurement programme at the Dudgeon Field in the southern North Sea to support wind park development. The Dudgeon mooring consisted of an Oceanor Seawatch Midi buoy configur...
Fugro carried out a geotechnical site investigation at 183 locations within the wind farm site area and at 30 locations along the proposed export cable routes. To carry out this work Fugro used a number of vessels over a nine and a half month period. The objectives of this project are to carry out a...
Fugro carried out a geotechnical site investigation at 183 locations within the wind farm site area and at 30 locations along the proposed export cable routes. To carry out this work Fugro used a number of vessels over a nine and a half month period. The objectives of this project are to carry out...
Cathie Associates were contracted by DONG as Clients Representative for a geotechnical survey for the Walney Wind Farm Extension project. The survey works initially consisted of utilising 3no. vessels: > Fugro Commander - Seabed CPTs > Fugro Excalibur - Shallow water CPTs and sampling / coring...
This report provides a summary of the monitoring completed at WDS during the construction period, with such monitoring undertaken during the period April 2013 to September 2014. Accordingly the report is termed the Construction Monitoring Report. Those parameters that required construction monitorin...
SSE Offshore Wind Generation requested HR Wallingford to perform a scour review based on the 2013 inter-array cable survey data at the Greater Gabbard Offshore Wind Farm (OWF). The survey data was assessed at every turbine location to provide descriptive scour parameters and to provide a baseline de...
This study forms Chapter 16 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). The study was carried out by LDA Design and describes the existing environment with regard to Seascape, Lands...
The SVIA was undertaken by landscape architects at LUC in 2013 on behalf of Forewind Ltd. The assessment considers impacts on seascape and views during construction, operation and decommissioning of Dogger Bank Teesside A & B. The assessment of impacts on landscape and views arising from the ons...
Statoil have contracted Metocean Services International (MSI) to deploy a mooring for measurement of current profiles in 110m water depth offshore Scotland. Current measurements were undertaken with an upward-looking 300kHz ADCP and Aquadopp single point current meter, deployed near the seabed. The ...
Showing 8861 to 8870 of 928252 results.