Search across ocean data collections and information systems.
As part of the Navigation Risk Assessment of the proposed Brims Tide Array Project, 28 days of shipping data surrounding the Agreement for Lease (AfL) area is being gathered. The data are being gathered over 2 x 14 day periods to give account to seasonal and tidal variations.
Anatec was commissioned by Xodus Group Ltd on behalf of Hywind Scotland Limited (HSL) (hereafter referred to as ‘Statoil’) to perform a shipping and navigation assessment of the proposed Hywind Scotland Pilot Park Project in Buchan Deep off Peterhead. The report presents information on the propos...
The export of power from the WODS offshore wind farm is transferred through 2 designated main export power cables connecting the wind farm with onshore installations. The scope of work carried out by CT Offshore has been to complete a MBES, SSS and a TSS rov survey of both cables, from here and o...
The Technical Report within this series is concerned with the environmental studies undertaken to inform the EIA and HRA of seabirds and marine mammals for the proposed Hywind Scotland Pilot Park Project, a demonstration floating offshore windfarm being progressed by Hywind Scotland Limited (HSL)....
A FLiDAR has been positioned just outside of the Burbo Bank Extension Offshore Wind Farm boundary. This series documents all report and data collected/generated from this instrument.
LiDAR data from the Cranfield LiDAR and St John's LiDAR. This data has been provided for the First Flight Wind proposed offshore wind farm in Northern Ireland, but as this project has been cancelled, data is incomplete and may not have full reports.
LiDAR data from the Cranfield LiDAR and St John's LiDAR. This data has been provided for the First Flight Wind proposed offshore wind farm in Northern Ireland, but as this project has been cancelled, data is incomplete and may not have full reports.
Mainstream Renewable Power Limited (Mainstream) is currently developing the Neart Na Gaoithe (NNG) offshore wind farm site and export cable corridor in Blocks 25/19, 25/24, 25/25 and 33/4 of the UK sector, North Sea. Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Geoconsulting Limite...
Fugro Emu Ltd. deployed met buoys in the north and south of the proposed First Flight Wind offshore wind farm site to measure current and wave parameters. Data from these buoys and any processed data that was carried out has been provided as packages within this series. The project was cancelled and...
Fugro Emu Ltd. deployed met buoys in the north and south of the proposed First Flight Wind offshore wind farm site to measure current and wave parameters. Data from these buoys and any processed data that was carried out has been provided as packages within this series. The project was cancelled and...
Showing 8851 to 8860 of 928252 results.