Statoil intends to install the Hywind Offshore Windfarm, with five floating wind turbines anchored to the seafloor together with an export cable to the mainland. The Turbine Site Area is situated 25 km east of Peterhead where the cable route will landfall. The water depth in the surveyed Export Cabl...
MMT was contracted by DONG to perform a geophysical out-survey in the planned offshore wind farm Westermost Rough outside the Yorkshire coast, England. The Westermost Rough wind farm site is located approximately 8 km east of Yorkshire and the site is 5710 by 5710 m (approximately 35 km2). A previou...
This study assesses the navigational risk of installing an export cable route from the Skerries Tidal Array and complements the existing Navigation Risk Assessment. The assessment was undertaken utilising the Formal Safety Assessment approach adopted by the International Maritime Organisation. The a...
Maritime Archaeology (MA Ltd) has been commissioned by Westermost Rough Ltd (WMR Ltd) to provide a geoarchaeological analysis of offshore sediments of possible archaeological and palaeoecological significance. This analysis aims to characterise and comment on the geoarchaeological potential of the s...
N-Sea Survey B.V. (hereinafter referred to as N-Sea) was awarded the contract by DONG Energy Walney Extension (UK) Ltd. to undertake geotechnical sampling investigations, consisting of CPTs (cone penetration tests) and vibrocores at specified locations. Sixty six (66) locations were identified by DO...
The report in this series presents the factual results from laboratory tests on soil samples from the Burbo Bank Extension Project, performed at NGI’s laboratory in Oslo, Norway. It also includes some interpretation of the laboratory tests with respect to diagrams with cyclic and average shear strai...
As the cable now extends, for a relatively short distance (approximately 725m), outside of the area that was considered in the environmental impact assessment for the project, an additional assessment has been undertaken. To inform this, geophysical data have been collected on two survey occasions, ...
During the completion of the Environmental Impact Assessment required for this development, a request was made for bat analysis and review, despite the fact that this was not included in the original scoping requirements for the project. Given Narec’s unique role as a national centre for offshore...
The report in this series provides a summary of historical metocean data which Narec has acquired in proximity to the site, and is intended to provide an overview of conditions which occur on site. Data is taken from multiple instruments which were deployed by Narec both on the seabed using upwar...
The Food and Environment Protection Act (FEPA) Licence (33097/07/0) for the Greater Gabbard Offshore Wind Farm (GGOWF) required the subsea noise during the operational phase of the wind farm to be measured to assess ‘various frequencies across the sound spectrum at a selection of locations immediate...