Search across ocean data collections and information systems.
EGS (International) Ltd was contracted to undertake the 2013 Post-Construction hydrographic and geophyscial survey (Multibeam and side scan sonar systems) of the Lynn and Inner Dowsing (L&ID) Wind Farms and export cable routes. Additionally, an environmental survey was required for the 54 No Cab...
In August 2013 EGS International were commissioned to carry out bathymetric surveys of the London Array Export cable routes. The Bathymetric surveys were to cover the 4 export cables corridor as laid and with a buffer of 25m either side of the outermost cable. The vessel mobilisation was carried out...
EGSi have been contracted to conduct a detailed bathymetric and geophysical survey of the Ormonde OWF and export cable route that can be compared with the data collected from previous surveys in order to meet the Marine Licence requirements. These require an assessment of the changes of both the bat...
In June 2013 EGS (International) Ltd was contracted to undertake the third post construction (6 month) survey of the windfarm. The operations involved monitoring changes to seabed morphology around the turbines and substations as well as along the inter array cable and export cable routes. EGSi carr...
The survey of the Dogger Bank Tranche A area and the associated export cable corridor was undertaken by Gardline Environmental Limited (Gardline) between 07/05/2011 and 30/01/2012. The specific objective of the project was to provide characterisation of benthic ecological conditions specific to the ...
This report details the deployment of an Acoustic Doppler Current profiler in the Inner-Sound, Pentland Firth. The results are presented for both wave and tidal current analysis. Due to excessive pitch and roll during deployment results have been averaged to 1 minute to reduce random error. Tidal cu...
In October 2013 Environmental Scientifics Group (ESG) were commissioned by Dong Energy UK (DONG) to conduct an intertidal geophysical survey over an area of foreshore at Rhyl in Denbighshire. The area to be surveyed is the proposed cable landing point from an extension to the existing Burbo Bank Off...
EcoNorth Ltd was commissioned to undertake a Phase 1 habitat survey, extended to identify any use for the site by protected and notable species, on an area of land along the road between East Sleekburn and Cambois to the North of the Blyth Estuary; adjacent to, and including parts of, the former Bly...
EcoNorth Ltd was commissioned by NaREC to undertake reptile and butterfly surveys on an area of land along the road between East Sleekburn and Cambois to the north of the Blyth Estuary; adjacent to, and including parts of, the former Blyth coal fired power station site. The survey area follows the r...
EcoNorth Ltd was commissioned to undertake a Phase 1 habitat survey, extended to identify any use for the site by protected and notable species, on an area of land along the road between East Sleekburn and Cambois to the North of the Blyth Estuary; adjacent to, and including parts of, the former ...
Showing 8701 to 8710 of 928252 results.