Search across ocean data collections and information systems.
The Sussex IFCA in collaboration with the Environment Agency (EA) and Rye Harbour Nature Reserve (RHNR) undertook small fish surveys monthly June-September on the beach to the west of Rye harbour entrance using fyke nets and a beach seine net, and in Rye bay and off Hastings and Eastbourne in Septem...
ABPmer were commissioned to assess the baseline physical processes active on the Islay wind farm site. The assessment had been developed through the analysis and interpretation of data and information from a variety of sources. These include a programme of surveys undertaken to support the EIA pr...
This study forms chapter 7 of the Stage 2 Preliminary Environmental Information (Stage 2 PEI) of the Rhiannon Offshore Wind Farm, which is part of the Environmental Impact Assessment (EIA). The study was carried out by ABPmer and it describes existing environment with regard to Physical Processes an...
Using regulator guidance, this Navigational Risk Assessment (NRA) identifies and analyses both the base case and future case risk associated with the development of Dogger Bank Creyke Beck A and B. Analysis and collision risk modelling was undertaken based on three scenarios as follows: Dogger Bank ...
Anatec Ltd have been commissioned by Centrica Renewable Energy Ltd to perform a risk assessment for the interaction between fishing vessels and the Lincs Offshore Wind Farm export cable and inter-array cables. The reports in this series present an analysis of fishing activity levels in and around th...
Anatec were commissioned by Centrica Renewable Energy Ltd to assess the risk of damage to their planned cable route in The Wash from vessels dragging anchor and from emergency anchoring. This report presents an update to the risk assessment, using 12 months of AIS data collected from September 2011 ...
As part of the Navigation Risk Assessment of the proposed Costa Head Wave Farm development, 28 days of shipping data surrounding the Agreement for Lease (AfL) area is being gathered. The data is being gathered over 2 x 14 day periods to give account to seasonal and tidal variations. This series co...
An oil and gas industry platform site survey acquired under licence P098 between August and December 2013. The block number traversed was 30/2a.
An oil and gas industry debris clearance, jack-up rig site survey acquired under licences P016, P774 in June 2013. The block number traversed was 47/03.
An oil and gas industry site survey for a semi-sub rig acquired under licences P236, P296, P104 in June 2013. The block numbers traversed were 211/13, 211/14, 211/18.
Showing 8651 to 8660 of 928252 results.