Search across ocean data collections and information systems.
Osiris Projects were commissioned in August 2012 by SSE Renewables, Costa Head Wave Farm Ltd and Brims Tidal Array Ltd to carry out three contractually separate geophysical surveys around Orkney, at Costa Head, Westray South and Brims, to assess the suitability of the locations for the potential ins...
Osiris Projects were commissioned in July 2012 and February 2013 by Navitus Bay Development Ltd to carry out a detailed hydrographic and geophysical cable route development survey for the Navitus Bay windfarm development, offshore Dorset. The main objectives of the surveys were: ? Measure seabed top...
Partrac Ltd were contracted by SSE Renewables to deploy two Waverider buoys off Costa Head in the Orkney Island archipelago. The objective of this study was to provide wave data (height, period, direction and spread) for wave power analysis that will inform the developer's physical processes mode...
As part of the investigation for cable landfall sites for the Irish Sea Zone (ISZ), there was a requirement to collect one month of oceanographic (wave and tidal current) data from three potential cable landfall sites off the Anglesey coast. This is to provide calibration data for a hydrodynamic mod...
Precision Marine Survey Limited (PMSL) were commissioned by Forewind Limited to undertake an assessment of fish and shellfish assemblage within the inshore region of the proposed Dogger Bank Teesside A & B export cable corridor for the Dogger Bank Teesside A & B offshore wind farm developmen...
Osiris Projects were commissioned in August 2012 by SSE Renewables, Costa Head Wave Farm Ltd and Brims Tidal Array Ltd to carry out three contractually separate geophysical surveys around Orkney, at Costa Head, Westray South and Brims, to assess the suitability of the locations for the potential in...
A series of sightings from the archives of the Orkney Islands Council.
A series of sightings from the archives of the Orkney Islands Council.
Two AWAC devices have been deployed at the North West Lewis Wave Farm. This series contains the data from the deployments. AWAC 1 data is in 7 deployments from 17/01/2012 to 07/03/2014. AWAC 2 data is in 4 deployments from 21/09/2012 to 28/10/2013
Shore based monitoring at the Brough Head Wave Farm Limited Agreement for Lease (AfL) area. The data collected will allow the numbers and distribution of seabirds and cetaceans using the waters surrounding the proposed deployment site to be characterised, along with their behaviour. This information...
Showing 8121 to 8130 of 928252 results.