Search across ocean data collections and information systems.
Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connectio...
Liverpool and Bangor Universities predicted the level of sediment migration for the Centrica round 3 Irish Sea - Zone 9 Offshore wind farm development. Geophysical and geological data was collected by Van Landeghem et al. during the AmSedIS project (research cruise CV12007), documenting sediment wav...
There are numerous measured and modelled datasets available within 20 km of the Wave Hub site covering different periods between 1989 and 2012. However, there is no single dataset covering the entire period and the measured datasets cover short periods of up to a year, consequently there is limit...
This series contains a collection of surveys undertaken as part of the year 1 post-construction monitoring programme for the Walney offshore wind farm development. Surveys completed include ornithological and benthic.
Wessex Archaeology was commissioned by Natural Power to carry out an Archaeological Assessment as a component of the overall Environmental Impact Assessment for the proposed NaREC Offshore Demonstration Project, located off Blyth, Northumberland. The assessment has been prepared in support of an app...
Wessex Archaeology was commissioned by Galloper Wind Farm Ltd to prepare an archaeological Written Scheme of Investigation Method Statement for the geotechnical survey techniques and geoarchaeological review of the results of the geotechnical survey associated with the proposed wind farm extensio...
The Archaeological Protocol for the Lynn and Inner Dowsing (LID) offshore wind farm projects has been in place since 2006 (Wessex Archaeology, 2006). Construction of the LID projects was completed in 2008 and the wind farms have been operational since early 2009, therefore this document updates t...
Wessex Archaeology (WA) was commissioned by Centrica Renewable Energy Limited (Centrica) to prepare a Written Scheme of Investigation (WSI) for the offshore elements of the Race Bank Offshore Wind Farm (Race Bank) project. The Race Bank project will consist of three physical elements: The offshore ...
Centrica Energy Renewable Investments Limited (CERI) now Celtic Array commissioned Wessex Archaeology to undertake this review. This review was undertaken between and April and October 2012 A total of 43 borehole sequences in the Zone 9 Irish Sea (SE Development) Area have been reviewed as part of a...
This addendum to the Environmental Statement confirms that the proposed project changes do not result in additional environmental impacts to those already assessed in the original Environmental Statement and consented project.
Showing 8081 to 8090 of 928252 results.