Search across ocean data collections and information systems.
This Environmental Statement (ES) has been prepared to support the consent application process for the East Anglia ONE offshore windfarm project under the Planning Act 2008. The East Anglia ONE project would consist of an offshore windfarm, offshore electrical infrastructure and onshore electrical t...
The purpose of this survey was to provide detailed seabed habitat and species informationallowing characterisation of the seabed as part of the Kyle Rhea Tidal Array Environmental Impact Assessment (EIA) to support the applications for statutory consents. The characterisation will support an assessm...
Dataset Description: QC and re-interpretion of 2D seismic data; Centrica Project: Round 3 Irish Sea - Zone 9 Offshore Wind Farm Development; Project Phase: Consenting; Work Carried Out By: Eurotech; Corresponding Centrica Document Title: QC and Interpretation of Irish Sea Zone 2D Seismi...
Fugro Alluvial Offshore Limited (FAOL) was requested by Dong Energy Power (UK) Limited to perform a geotechnical investigation at the site to provide soils information to assist in the design and installation of a cable route. The work was performed from the Fugro Commander from 25 October to 1...
On the instructions and under the supervision of Eneco Wind (the Employer/Engineer), a site investigation was carried out at a proposed meteorological mast location off the Dorset and Hampshire coasts by Fugro Seacore Limited (FSL) and reported by Fugro Engineering Services Limited (FES). The object...
A ground investigation has been carried out by Fugro Seacore Limited (FSCL) on the instructions of DONG Energy Burbo Bank Extension (UK) Limited (the Client) and under the supervision of Ramboll and RPS Engineering (the Engineers), at Burbo Bank Extension Offshore Wind Farm. The site is located w...
Fugro GeoConsulting Limited was requested by Galloper Wind Farm Limited (GWF) to perform a geotechnical investigation at the Galloper Wind Farm site in Block 57, UK Sector of the North Sea.
On behalf of Mainstream Renewable Power Limited , Fugro GeoConsulting Limited has carried out a geotechnical site investigation at Neart Na Gaoithe offshore wind farm site and export cable corridor in Blocks 25/24, 25/25, 25/29 and 33/4, of the UK sector, North Sea. The survey presents the results o...
Geotechnical investigation to provide sufficient data to enable the zone-wide characterisation of the soil and rock conditions for combination with the regional geophysical data to inform the technical and commercial planning process. This investigation was for the Centrica round 3 Irish Sea - Zone ...
Fugro GeoConsulting Limited (Fugro) was requested by Centrica Energy Renewable Investments Limited (CERI) to perform a geotechnical investigation at the South-East Development Area of the proposed Irish Sea Wind Farm to provide sufficient d...
Showing 7951 to 7960 of 928252 results.