Search across ocean data collections and information systems.
EGS (International) Ltd was contracted to undertake a hydrographic and geophysical survey around the turbines of the Lynn and Inner Dowsing (L&ID) Wind Farms to assess for the extent of seabed scour around the monopiles. Additionally, the contract covered a hydrographic survey of the array ca...
An investigative environmental survey was carried out at two proposed jack-up footprint locations situated within the Inner Dowsing wind farm owned by GLID Wind Farms TopCo Ltd, located off the coast of Skegness (Lincolnshire). These two locations were in close proximity to turbines ID18 (locatio...
An investigative environmental survey was carried out at two jack-up footprint locations within the Lynn and Inner Dowsing (L&ID) wind farms, owned by GLID Wind Farms TopCo Ltd, located off the coast of Skegness (Lincolnshire). These sites were in close proximity to turbines ID25 (locations G...
In May 2012 EGS (International) Ltd was contracted to undertake a pre-construction geophysical and bathymetric survey of the export cable route of the future Walney Extension (WOW03) windfarm site. The surveyed areas were located 22-30 km north-northwest of Walney Island, UK. Survey operations...
In May 2012 EGS (International) Ltd was contracted to undertake a bathymetric survey in the post-construction (operational) phase of the project to determine whether there are any changes to seabed morphology at the wind farm site including inter array cables and along the export cable routes. In...
In November 2012 EGS (International) Ltd was contracted to undertake the second post construction (6 month) survey of the wind farm. The aim of the survey was to identify changes to seabed morphology within the wind farm and along the export cable routes. To meet the requirements of the survey EG...
Description: Geophysical and Environmental Survey Export Cable Area of the seabed between the southeast area of the Round 3 zone OWF site off the west coast of the UK in the east Irish Sea, known as the Irish Sea Zone and the north Anglesey coast, with the primary objective of surveying the area for...
EMU Limited (EMU) was commissioned by Galloper Wind Farm Limited (GWFL) to conduct a geophysical investigation and provide detailed seabed information on the Galloper Offshore Wind Farm UXO and Shallow Gas Surveys project. The survey was required in order to mitigate the risks of UXO and shallow gas...
The aim of the survey was to characterise the benthic ecological conditions specific to the site and the predicted impacts of the proposed Navitus Bay offshore wind farm sites to inform the EIA.
This data contains the ranked abundance of the fish species caught during the benthic ecology study. In agreement with the Marine Management Organisation, two seasonal site specific set net surveys were designed and implemented. The first survey was conducted in June 2012 with a second identical sur...
Showing 7931 to 7940 of 928252 results.