Search across ocean data collections and information systems.
An oil and gas industry environmental, drilling hazard, semi-sub rig site survey acquired under licence P1212 between May and June 2011. The block numbers traversed were 15/13b, 15/8.
An oil and gas industry site survey for a semi-sub righ acquired under licence P1650 between September and October 2011. The block number traversed was 14/13.
The information in this document is based on baseline survey data collected in Sanda Sound, initially presented in document number ODL-P10-003-E4011, according to the methodology laid out in A-30488-S00-TECH-001. These documents stand in support of Oceanflow Development Ltd.’s application for a mari...
The objective of the survey is to obtain a series of digital cameras stills images of the seabed and seabed communities along the proposed line of a cable linking a one quarter scale EVOPOD tidal energy device to a shore terminal and also within the ambit of the device mooring area prior to deployme...
This project involves installing a 1/4 scale Evopod device rated at 35kW for experimental purposes. The unit will be fitted with a 4.5m diameter four bladed un-ducted turbine. The unit will be connected to a midwater buoy that will be moored in location by a four line chain/wire catenary mooring sys...
This Navigational Risk Assessment supports an application to install in the Sound of Sanda a pre-commercial demonstrator project for the installation, operation and support of a ¼ scale tethered tidal energy device – Evopod – with a nominal installed capacity of 35kW. The application is made by Ocea...
During spring and early summer 2011, systematic environmental wildlife surveys were commissioned by Ocean Flow in Sanda Sound, off Pennyseorach farm. These surveys consisted of: (i) Observations of seabird numbers and behaviour in the Sound, (ii) Observation of cetacean numbers and behaviour in ...
Partrac Ltd was contracted by SSE Renewables to undertake collection of metocean data (tidal currents, waves and turbulence) at Brimms Ness, which lies to the west of the proposed Cantick Head tidal sites. Two instrumented, ballasted bed-frames each comprising a 300 kHz T-RDI acoustic Doppler curren...
2011 Aquaterra ROV Survey
Osiris Projects were commissioned by MT Højgaard in January 2011, to carry out a pre-construction geophysical survey at the proposed Lincs offshore wind farm site, which lies approximately 8 - 12km off the Lincolnshire coast, between the River Humber and The Wash. The site is situated to the east...
Showing 7321 to 7330 of 928252 results.