Search across ocean data collections and information systems.
The key objective of this study was to design a framework to allow marine aggregates extraction options to be analysed using socio-economic information showing the interactions between different uses of the marine environment at both local and regional levels and the data requirements for such a fra...
The required survey is to inform the environmental and engineering assessment of a potential offshore wind famt export cable route. The route runs from a proposed demonstration site adjacent to the existing Gun?eet Sand I and 2 operational wind farms to a landfall on the Clacton shoreline. ln ...
The Lincs OWF Project involves the development of an offshore wind farm off the coast of Skegness (Lincolnshire) by Centrica Renewable Energy. High resolution multibeam bathymetric and high resolution side-scan sonar geophysical survey data were required along the newly laid LINCS LS41-42 array cabl...
The Lincs OWF Project involves the development of an offshore wind farm off the coast of Skegness (Lincolnshire) by Centrica Renewable Energy. Preconstruction bathymetric and geophysical survey data was required along the LINCS array cable and collector cable routes. Survey lines were divided into 2...
A total of six mounds were selected for survey, two are located within the L&ID wind farms, created in 2007 adjacent to turbines LN02 and LN29 and named Mound A and Mound B respectively. The four other mounds, labelled Mound C to F are located within the Lincs wind farm at turbines LD61, LS62...
The Lincs OWF Project involves the development of an offshore wind farm off the coast of Skegness (Lincolnshire) by Centrica Renewable Energy. The development of the wind farm will include the installation of an export cable running from the wind farm site across The Wash to a landfall near Sutto...
A total of six mounds were selected for survey, two are located within the L&ID wind farms, created in 2007 adjacent to turbines LN02 and LN29 and named Mound A and Mound B respectively. The four other mounds, labelled Mound C to F are located within the Lincs wind farm at turbines LS61, LS62...
EGS (International) Ltd was contracted to undertake a marine geophysical survey of six cables within the Lynn Offshore Wind Farm (OWF) which had not been buried to target depth during the original installation phase. The cables to be surveyed were between the following wind turbines; LN01 to LN06...
EGS (International) Ltd (EGSi) was contracted to undertake the third post-construction marine geophysical and benthic ecology survey of the Lynn and Inner Dowsing (L&ID) offshore wind farm sites and export cable route corridors. This document relates to Phase 2 of the survey, benthic ecology. A ...
EGS (International) Ltd was contracted by Centrica in 2011 to undertake a geophysical survey of the Lynn & Inner Dowsing (L&ID) Offshore Wind Farms and export cable route corridors (Figure 1) in order to determine the nature and distribution of broad scale sediment types and identify seabed ...
Showing 7231 to 7240 of 928252 results.