Search across ocean data collections and information systems.
An oil and gas industry site survey acquired in April 2011. The block number traversed was UKCS 9/9.
An oil and gas industry site survey acquired between April and May 2011. The block numbers traversed were 204/19, 204/24, 204/20.
An oil and gas industry site survey acquired in April 2011. The block number traversed was UKCS 23/26.
An oil and gas industry site survey acquired in November 2011. The block numbers traversed were 213/25, 213/20, 213/19, 213/24.
A 300KHz RDI vessel-mounted ADCP was deployed over several sites within the Cantick Head Crown Estate Area for Lease (AfL has since been relocated and renamed to Brims Ness) in April 2011. The following locations were surveyed within the boundary: -Site 08: 58.76395°N 3.19016°W -Site 09: 58.77472°...
The surveys were carried out as part of the environmental monitoring programme outlined within FEPA licences 31792/10/1 and 31814/10/2 for the Lynn and Inner Dowsing (LID) wind farms respectively. This series details the findings of the first and second year of post-construction surveys, and makes c...
The following report details the findings of the September 2011 pelagic fish characterisation survey, undertaken in the vicinity of the Tranche A and along the proposed export cable corridor between the 14th and 28th September 2011. The survey methodology, vessel and sampling gear were agreed in ...
Brown and May Marine Ltd. was commissioned by DONG Energy to undertake post construction fisheries surveys within the Gunfleet Sands Offshore Wind Farm development. The post construction surveys used the same vessel and gear specifications and survey methodology as the pre-construction surveys, unde...
The Tranche A Otter and Beam Trawl series details the findings of the summer 2011 adult and juvenile fish characterisation survey, undertaken in the area of Tranche A of the Dogger Bank offshore wind farm and along the proposed cable route between the 17th and 27th August. Inshore juvenile fish samp...
This series presents results of the surveys in the Ormonde field in 2011. The surveys took place between May and September while considerable construction and commissioning activity was ongoing and follows a period of active construction in 2010.
Showing 7201 to 7210 of 928252 results.