Search across ocean data collections and information systems.
An oil and gas industry site survey (investigation before drilling) acquired under licence PL303 (Norwegian) between August and October 2010. The block numbers traversed were 16/19 (UK), 15/8 (Norwegian).
An oil and gas industry site survey for a semi-sub rig acquired under licence P1064 between October and November 2010. The block numbers traversed were 210/29, 210/30.
An oil and gas industry site survey for a semi-sub rig acquired under licence P1064 in April 2010. The block numbers traversed were 210/29 and 210/30.
An oil and gas industry site survey for a jack-up rig acquired under licence P1540 in April/May 2010.
Subacoustech Environmental has undertaken a study to model the potential impact underwater noise generated by piling operations during the construction of the Triton Knoll Offshore Wind Farm (TKOWF) could have on local populations of fish (specifically, herring, sole and lemon sole) and marine mamma...
Data on the numbers and distribution of waterbirds are required for the Strategic Environmental Assessments of Offshore Wind Farms (OWF). From February to April 2009, aerial surveys of waterbirds and seabirds were conducted off the Norfolk coast, UK, within the proposed boundary for Zone 5 of the Ro...
This series presents the results of underwater noise monitoring carried out by Subacoustech Environmental Ltd between May and June 2010 during impact piling operations to install jacket pile foundations at the Ormonde Offshore Windfarm (Ormonde) site. The results have been interpreted in terms of th...
TerraConsult Ltd (TCL) were commissioned by Offshore Design Engineering Ltd (ODE) to carry out a ground investigation at Barrow Docks in Barrow-in-Furness, Cumbria. The work was carried out during the period 13th January 2010 to 21st January 2010. The area of investigation was the dock wall referred...
Titan Environmental Surveys were commissioned by Centrica Renewable Energy Ltd to collect current and suspended particulate matter from four sites around the Lynn and Inner Dowsing Wind Farms over the course of three deployments during the construction of the two wind farms, namely pre, during an...
In January and February 2009, Titan Environmental Surveys Limited were commissioned by Thetis Energy Ltd to conduct a detailed geophysical survey at Torr Head on the north east coast of Northern Ireland (Figure 1.1.1). The survey was to detail information on bathymetry, shallow geology, seabed fe...
Showing 6711 to 6720 of 928252 results.