The following data was collected by Oceanflow Development Limited to observe the characteristics of our tidal turbine test site. The flow speed data was important to the design of the tidal turbine system. This series contains drift test and velocity probe measurements.
DONG Energy awarded Offshore Marine Management (OMM) a contract to perform an inspection survey of the offshore export connecting the Burbo Offshore Wind Farm located to the shore in Liverpool Bay. This included the BB13 to BB14 inter array power cable. Burbo Offshore Windfarm is located approxim...
Osiris Projects were commissioned in July 2010, by Vattenfall Wind Power Ltd to carry out a geophysical survey for the proposed extension to the Kentish Flats 2 Offshore Wind Farm. The survey was completed under Osiris Projects Terms and Conditions and was carried out between 22nd July and 22nd Sept...
On the instructions of E.ON UK Solway Offshore Ltd and E.ON UK Offshore Energy Resources Ltd, Osiris Projects were commissioned to undertake a post-construction geophysical survey covering the proposed Robin Rigg Offshore Wind Farm development site. The survey was undertaken using Osiris Projects...
In October, Osiris Projects were commissioned by DONG Walney (UK) Ltd to carry out an export cable route survey from the proposed Walney Offshore Windfarm (WOW 1). This survey was extended under Variation Order No1 to include a multibeam and side scan sonar survey of the Walney Offshore Windfarm (WO...
The geophysical survey of Beatrice Offshore Wind Farm Site was undertaken by Osiris Project, commissioned by Senergy Survey & Geoengineering and carried out between 1st April and 21st May 2010. The main objectives were to assess detailed bathymetry, seabed features and shallow soil conditions fo...
PARTRAC Ltd undertook a VMADCP survey during a 13 hour complete spring tide to define the locations of high-energy current flow hotspots which could then be further investigated in the future using bottom-mounted ADCPs to determine the suitability for tidal energy conversion. Throughout the whole t...
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake Multibeam Echosounder (MBES) and Side Scan Sonar (SSS) surveys at the Gunfleet Sands Offshore Windfarm in the Thames Estuary. The scope of work included: 1. MBES and SSS survey of 100m wide corri...
As part of the ongoing assessments for the Humber Gateway offshore wind farm periodic video survey have been carried out in the vicinity of the met mast installed in August 2009 in order to provide some indication of scour. In addition, some further video work has been undertaken at the inshore end ...
Partrac Ltd were contracted to carry out a sediment monitoring survey on two occasions during the piling of the foundations at the Ormonde offshore wind farm. occurred during a neap tide (6th May 2010) and during a spring tide (1st June 2010). No trace of elevated total suspended solids were detecte...