Search across ocean data collections and information systems.
An oil and gas industry site survey for a semi-sub rig acquired under licence P114 in October 2009. The block number traversed was 23/27a.
An oil and gas industry site survey for a semi-sub rig acquired under licence P296 in December 2009. The block number traversed was 211/14.
An oil and gas industry site survey for a semi-sub rig acquired under licence P012 in August 2009 (shallow gas only) and October 2009 (anchoring only). The block number traversed was 23/22a.
An oil and gas industry site survey acquired under licences P335, P726 in July/August 2009. The block numbers traversed were 9/11a, 9/11b. This dataset is restricted, licence partners can gain access via Statoil UK.
This project has been undertaken by Subacoustech Environmental Ltd for DONG Energy. It describes a series of underwater noise measurements at the Gunfleet Sands Offshore Wind Farm site during installation of monopile foundations. Herring are known to spawn in the Blackwater River region to the west ...
The aim of this report is to highlight the impacts offshore renewable energy development will have on surfing resources and recreation. Using data from a 2001 survey of surfers in Cornwall a profile of surfer's habbits has been drawn up, this along with UK and Australian surfer spending data has bee...
An oil and gas industry site survey for a semi-sub rig acquired under licences P296, P945 in July/August 2009. The block numbers traversed were 210/20, 210/25, 211/16, 211/21.
An oil and gas industry site survey for a jack-up rig acquired under licence P296 in July 2009. The block number traversed was 211/26.
The report in this series presents results from a Caird-Crown Estate research project to investigate the geomorphic history of the seabed and associated features within the greater Thames estuary within a region of over 5000km2 bounded by Aldeburgh (Suffolk), Southend-on-Sea (Essex) and Margate (Ken...
Fera were commissioned by PMSS to report on the findings of seabird surveys undertaken on behalf of PMSS by Stuart Thomas to inform the proposed installation of an array of marine current turbines (“tidal array”) off The Skerries, Anglesey. The seabird surveys were to evaluate the importance and ...
Showing 6021 to 6030 of 928252 results.