Emu Limited were commissioned by Neart Na Gaoithe Offshore Wind Limited to undertake a geophysical survey of the Neart Na Gaoithe proposed offshore wind farm site and buffer, and two possible cable routes: Torness (including Thorntonloch and Skateraw connections) and Cockenzie. The propose...
Preliminary engineering design work and discussions with stakeholders highlighted a number of issues relating to the cable corridor and the indicative cable routes submitted in the original consent applications for both the proposed Docking Shoal and Race Bank Offshore Wind Farms. Three additional s...
Emu Limited was commissioned by RWE Npower Renewables Limited to monitor the physical oceanographic processes in the vicinity of the Greater Wash, for the proposed Triton Knoll offshore wind farm development. This included the monitoring of tidal heights, currents and waves at three locations within...
An oil and gas industry site survey acquired in August 2009. The block number traversed was 48/30. The 2D HR seismic survey covered an area for the site of a proposed development drilling location and two new proposed platforms in the Deborah Field.
An oil and gas industry site survey acquired in July 2009. The block number traversed was UKCS 21/12b.
An oil and gas industry site survey acquired between September and October 2009. The block numbers traversed were 110/12a, 110/12b.
An oil and gas industry site survey acquired between September and October 2009. The block number traversed was 110/12.
The principal objective of the survey was ascertain whether Sabellaria spinulosa reef had built up in the windfarm turbine areas, or in the associated cable route since previous surveys undertaken in 2008. The survey work presented here found no evidence to suggest that Sabellaria spinulosa reef ...
The aim of the survey was to map the location of the habitats present in the vicinity of the proposed cable route. A biotope survey was carried out along a corridor 500m either side of the cable route between mean high water springs and mean low water springs. This metadata file has been created by...
This report provides the Environmental Monitoring Plan (EMP) for the pre-construction baseline monitoring for the Teesside Offshore Wind Farm. To discharge the FEPA consent conditions the key topics that require pre-construction baseline surveys for subsequent monitoring and assessment purposes are ...