Search across ocean data collections and information systems.
Series Description: Race bank and Docking Shoal Supplementary Environmental Information (SEI) Planning Application Reports and Dataset; Centrica Project: Docking Shoal Offshore Wind Farm Development; Project Phase: Consenting; Date Range: 2009-2010; Available Datasets and supporting documentation: 1...
An oil and gas industry site survey for a platform acquired under licence P016 in October 2009. The block number traversed was 47/3a.
Cyrrus Ltd has conducted an in depth assessment of all the aviation issues pertaining to the development of the R3 Atlantic Array. The R3 Atlantic Array is likely to be perceived as having an adverse operational impact on the performance of the following equipments: - Cardiff Airport's Primary Sur...
This Environmental Statement has been prepared for Westermost Rough Ltd. to support its application for consent, licenses, permissions etc. for the construction of an offshore windfarm in the North Sea off the Yorkshire coast at Tunstall, with associated onshore works in East Riding of Yorksh...
This Decommissioning Programme has been prepared by DONG Energy in August 2009 to comply with the license conditions for Walney Offshore Windfarm. The proposed decommissioning measures set out in this project aims to adhere to the existing UK and International legislation and guidance notes. In addi...
An oil and gas industry site survey for a semi-sub rig acquired under licences P1051, P359, P749 between August and October 2009. The block numbers traversed were 23/16b, 23/16c, 23/11a.
This project examines the current commercial fishing baseline and impact assessment of Westermost Rough offshore wind farm and its export cable. This desk based study was undertaken by Brown and May Marine Ltd using a combination of data sources given that there is no recognised model for establishi...
The aim of the Outer Thames Estuary Regional Environmental Characterisation (REC) is to provide an environmental reference statement defining marine and seabed conditions within the study area. Following survey conducted in 2007 (link) the REC reviews existing literature but is largely based upon th...
The aim of the Thames Regional Environmental Characterisation (REC) survey, funded through the Marine Environment Protection Fund of the Aggregate Levy Sustainability Fund, survey was to acquire data, of the highest quality and resolution possible, to enable broadscale characterisation of the seabed...
Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connectio...
Showing 5961 to 5970 of 928252 results.