Search across ocean data collections and information systems.
The work covered by this report was undertaken for Scira Offshore Technology Limited working on behalf of StatoilHydro ASA. The purpose of this report was to provide information on the ground conditions beneath the site in order to assess the suitability for development of a proposed substation adja...
The work covered by this report was undertaken on behalf of SCIRA Offshore Energy Limited in accordance with Tender No. 1117 and associated Contract No. 1117, the letter of intent relating to which was dated 9 January 2008. The work was detailed in Harrison Geotechnical Engineering quotation refe...
At the request of Subocean Ltd, a Cone Penetration soil investigation was carried put on Lynn and Inner Dowsing by Lankelma Ltd The tests performed consisted of 11 electric Piezocone Tests (CPTU’s) to a maximum depth of 13.99 or refusal. All tests were performed and measured the cone resistance, loc...
Supplementary data to the 2005 data suite to enhance the coverage of the previous biological assessment as well as providing more detailed information regarding sensitive resources identified in the vicinity of the construction site,
This extension project was set up to prepare a Genus Trait Handbook by the extraction of the genus traits data for 150 genera held within the MEPF 04/02 database. The task involved sourcing photomicrographs for all of the genera, interacting with Cefas, JNCC & MarLin and entering the images and ...
StatoilHydro is planning to install two export cables to connect its Sheringham Shoal Offshore Wind Farm to the UK National Grid. The landfall will be at Weybourne on the North Norfolk coast. This desk study was commissioned to identify the optimum burial depth of the cables at the landfall by in...
This project examines the public participation work undertaken by Mistral on behalf of Dong Energy in relation to the proposed offshore wind farm at Westermost Rough. As part of the procedure surrounding the development of offshore wind farms, the developer is required to hold public exhibitions reg...
The purpose of the PEMP is to ensure that the construction of the offshore elements of the Rhyl Flats Offshore Wind Farm meets the requirements established by legislation, legal consents and environmental commitments, and that it follows environmental best practice. It contains nine parts: 1. RF...
On the instructions of Barrow Offshore Wind Limited, Osiris Projects were commissioned to undertake an inspection survey covering the Barrow Offshore Wind Farm export cable route, in conjunction with scour monitoring surveys at a series of selected turbine locations within the main development ar...
Osiris Projects were commissioned by DONG Energy to carry out a detailed hydrographic and geophysical survey at the Burbo Bank offshore wind farm development, together with an associated cable route and two separate transit routes. Data acquisition was undertaken by Osiris Projects using Ocean Ma...
Showing 5451 to 5460 of 928252 results.