Search across ocean data collections and information systems.
On the instructions of RSKENSR Environment Limited, Osiris Projects were commissioned to carry out a Post Construction Geophysical Survey covering the existing Barrow Offshore Wind Farm development. The Scour Monitoring Survey was undertaken in conjunction with the Post Construction Geophysical S...
This report examines the turbidity (suspended sediment) monitoring services during mono-pile installation at the Barrow offshore wind farm site, specifically during drilling operations. This was monitored to provide DEFRA with information to assist in assessing the environmental impact of this aspec...
On the instructions of Mammoet Van Oord, a multi-beam bathymetry survey has been performed over the proposed Burbo Offshore Wind Farm development site, off the north coast of the Wirral peninsula, Merseyside, UK. In addition, further multi-beam bathymetry data were collected within a 400m x 400m,...
Osiris Projects were commissioned by Ocean Marine Research Ltd on behalf of Peter Madsen Rederi A/S, to carry out a bathymetric survey at the Burbo Bank offshore wind farm, where rock dump operations around existing turbine monopiles have recently been completed. The scope of work involved surve...
As part of the site development at Gunfleet Sands, a detailed geophysical survey was conducted from September to December 2006 by Osiris Projects Ltd to establish subsurface conditions prior to piling and ploughing operations. The survey was designed specifically to provide very accurate bathymetry...
RPS Planning Transport and Environment (RPS) were commissioned to undertake a Flood Risk Assessment (FRA) for the laying of electrical cables from three offshore wind farms to an existing electrical substation at Walpole. Centrica Renewable Energy Limited (CREL) will need to extend the substation...
Centrica are proposing to construct an offshore wind farm off the coast of Norfolk and Lincolnshire. RPS Transport has been commissioned to undertake a route assessment study to establish suitable routes for construction vehicles associated with the onshore cable route required to connect the win...
This project focuses on surface water quality which was sampled at 18 locations in the vicinity of the proposed onshore cable route (see downloadable data for locations). Observations were made of the charater of the water and watercourse, with a number of key parameters analysed on site. This provi...
RPS have been requested by Centrica Energy to give an Environmental Appraisal of the intertidal habitats along the proposed Lincs, Docking Shoal and Race Bank cable route, as part of an Environmental Impact Assessment (EIA) for a Round 2 offshore wind farm development. This appraisal uses existing p...
RPS have been requested by Centrica Energy to give an Environmental Appraisal of the intertidal habitats along the proposed Lincs, Docking Shoal and Race Bank cable route, as part of an Environmental Impact Assessment (EIA) for a Round 2 offshore wind farm development. This appraisal uses existing p...
Showing 4621 to 4630 of 928252 results.