Search across ocean data collections and information systems.
In July 2006 Enviros Consulting were commissioned by Greater Gabbard Offshore Winds Limited (GGOWL) to undertake a flood risk assessment for the site of a proposed sub-station at Sizewell Wents close to the existing Sizewell A Power Station. It is proposed that this sub-station would be construct...
This series contains results from the June 2006 Wash Cable Corridor Video Survey, carried out by Envision Mapping Ltd. In addition, biotope figures from the Race Bank Environmental Statement are provided.
The survey was designed to acquire data to define bathymetric, seabed and shallow geological conditions as well as possible magnetic anomalies along a 4km long and 500m wide route corridor that runs from the south-west corner of the Wave Hub development site.
Walpole electricity sub-station is located approximately 1.5km west of the village of Walpole St Peter, Norfolk. The evaluation area occupies parts of three flat fields situated between the sub-station and a minor road. At the time of survey one field was under stubble, the second was set aside an...
The Walney Offshore Wind Farm is planned for a site approximately 20km off the Isle of Walney, Cumbria, covering an area with water depths of between 18m and 31mCD. This report has been prepared for DONG and their design consultants Niras. It sets out the predicted winds, waves, currents and wat...
The Walney Offshore Wind Farm is planned for a site approximately 20km off the Isle of Walney, Cumbria, covering an area with water depths of between 18m and 31mCD. This report has been prepared for DONG and their design consultants Niras. It sets out the predicted winds, waves, currents and wat...
The South West of England Regional Development Agency (SWRDA) is proposing the Wave Hub project to provide the electrical infrastructure necessary to support and encourage developers of wave energy converter devices (WECs) to generate electricity from wave energy. It will allow developers the opp...
An oil and gas industry site survey and habitat assessment acquired in July 2006. The block numbers traversed were 14/17, 14/18, 14/22, 14/23.
An oil and gas industry environmental site survey acquired in July 2006. The block number traversed was 14/18.
This Seascape and Visual Assessment, which forms part of the Environmental Statement, considers the impact that the proposed offshore wind farm and associated offshore infrastructure will have on the existing landscape and seascape environment, the characteristic features of each environment and ...
Showing 4601 to 4610 of 928252 results.