Search across ocean data collections and information systems.
This study addresses the likely significant effects on Military Activity and Munitions Contamination of the Gunfleet Sands Project during its construction and operation stages. Subsequently, this section identifies the risk factors that could be encountered from historical Un-Exploded Ordnance (UXO)...
The Gunfleet Sands site falls within the general area with a known history of human conflict. During the past two world wars the Thames and surrounds was mined and bombed by all parties and the legacy of these conflicts is the continued presence of unexploded ordnance (UXO). The potential for such m...
The Gunfleet Sands Offshore Windfarm Environmental Statement presented data on birds obtained from the following marine surveys: • Boat surveys – undertaken monthly between October 2001 and July 2002 • Aerial surveys – undertaken in January and March 2002 It was agreed, however, that marine bird ...
RPS was commissioned to conduct an appraisal of the protected species issues regarding the terrestrial cable laying works for Gunfleet Sands Offshore Wind Farm. The site was assessed based on information from the ecological baseline surveys, Environmental Statement and a site walkover.
This project is about the flight height and abundance obtained on boat surveys undertaken between July 2002 and March 2005. The objective is to identify which, if any species regularly fly at a height that would expose them to a risk of collision.
The proposed development of the London Array Offshore Windfarm includes the installation of buried marine and terrestrial cables, construction of a substation and access road, and works associated with alterations of the existing National Grid overhead lines. The installation of the marine and terre...
This project examines the onshore and offshore elements of the environmental pre-construction monitoring undertaken at the site of the Barrow offshore wind farm to comply with the conditions of the FEPA Act. In some cases repeat surveys will take place to determine the changes following construction...
This report contains the specifications for the environmental surveying, including: archaeology, marine geology, benthos, fisheries, oceanography, noise and vibration, ornithology, cetaceans and seals, bathymetry and onshore cable route.
This report details the possible wind turbine layouts for Gwynt y Mor, the type of foundations that would be used and supporting structures and cabling between structures and substations. The impact of the construction, operating and decomissioning impacts on the physical environment are discussed. ...
This project examines the ecological assessment of a cable route undertaken at Pegwell Bay from within the site of the Thanet Offshore Wind Farm. This ecological assessment is required as part of the Ecological Impact Assessment (EIA) of the wind farm. The survey area for Phase 1 habitat/land use...
Showing 4181 to 4190 of 928252 results.