Search across ocean data collections and information systems.
An assessment of the noise impact from the Ormonde wind farm upon the surrounding areas with particular attention to the potential effects upon neighbouring properties. This assessment is to take account of operational noise when the wind farm is commissioned and noise associated with the constructi...
Gardline Geosciences was contracted by Hydro Soil Services to perform a geotechnical survey along the proposed cable route from landing point 1 to the proposed substation at the wind farm site. The results of the surveys are presented in a series of reports. As part of the survey, SEtech have undert...
The Environmental Assessment methodology follows the requirements set out in the draft ecological impact assessment methodology of the Institute of Ecology and Environmental Management (IEEM 2002). The first step is to identify the ecological value of the area under consideration, from International...
Kentish Flats particulars of deposit on the seabed, the licencing, timing and monitoring requirements from Aug 2003 till 31 July 2006. Terms and conditions under the Food and Environment Protection Act 1985 : Part II (as amended) - Deposits in the sea in connection with marine construction works: Li...
The Secretary of State for Environment, Food and Rural Affairs (hereinafter referred to as "the Licensing Authority") hereby authorises: KENTISH FLATS LIMITED DIAL HOUSE GOVETT AVENUE SHEPPERTON TW17 8AG Company Registration No: (hereinafter referred to as “the Licence Holder”) to depos...
This project examines the Navigation and risk assessment for the Thanet offshore wind farm site area. With one exception the study shows that the introduction of the wind farm will not raise any threat to shipping in the area.
Preliminary report detailing outline biotope and habitat mapping for the survey area, including a detailed benthic grab survey, a seabed photographic survey at selected sites in the windfarm area and an assessment of seabed resources along the two considered cable routes including intertidal sedimen...
A survey of biological resources in the vicinity of the Thanet Offshore Wind Farm was carried out by Marine Ecological Surveys Ltd. (MES) from May - August 2005. The survey comprised the following elements: • A quantitative survey of the benthic infauna inhabiting the sediments within and surroun...
The main objective of this project is to provide a framework for prediction of recoverability of biodiversity and community structure of marine benthos following cessation of dredging. This project aims to predict the rate of recovery of species diversity, population density and biomass for differen...
This Environmental Statement is provided in support of the application for the variety of consents required to construct and operate the Gwynt y Môr Offshore Wind Farm. It is intended to provide details on the proposed project, the need for and the benefits of the proposed wind farm, the regulator...
Showing 4151 to 4160 of 928252 results.