Search across ocean data collections and information systems.
The Department of Trade and Industry (DTI) has commissioned ABP Marine Environmental Research Ltd (ABPmer) to investigate the issue of sediment pathways and large-scale offshore wind farms as part of a series of supporting technical investigations related tot eh Strategic Environmental Assessme...
The objective of this study is to develop a new approach to predicting the impacts of aggregate extraction on the benthic environment. More specifically, the approach models the complex biological responses of recolonisation and recoverability to the physical processes associated with extraction act...
ABP Marine Environmental Research Ltd (ABPmer) has been commissioned by Greater Gabbard Offshore Winds Ltd (GGOWL) to undertake a coastal process study for the proposed Greater Gabbard Offshore Wind Farm (OWF) development. This report focuses on providing a baseline understanding of the coastal proc...
This project examines the likely sediment disturbance effects arising from the proposed installation methods for laying inter-turbine and export cables for the London Array Offshore Wind Farm as carried out by ABPmer. Various installation methods were assessed including ploughing, jetting, cutting a...
Anatec were commissioned by npower renewables (NR) to perform an AIS shipping survey and analyse the resultant data to inform the relocation of the Triton Knoll offshore wind farm site in the Greater Wash Strategic Environmental Assessment (SEA) area. This report presents a detailed analysis of 10...
This report was written by Anatec in March 2005 to assess the potential cumulative effects of the Offshore Windfarm developments in Morecambe Bay on navigation.
This project presents analysis of 28 days of survey data, collected during two 14 day periods from 7-21 December 2004 and 11-25 March 2005. The data was collected using radar, AIS and visual observations. A further 5 days of survey data was collected between 22-27 July 2005, as recommended in the re...
An oil and gas industry platform site survey acquired in May 2005. The block number traversed was 22/10.
An oil and gas industry site survey for seabed infrastructure acquired in October 2005. The block number traversed was 204/19.
An oil and gas industry site survey for debris clearance acquired in May 2005. The block number traversed was 22/25.
Showing 4081 to 4090 of 928252 results.