This report is concerned with analysis of the 2004 seal survey data, collected during the construction period of the wind farm. The Schedule to Licence states that a monitoring programme for the seals, as agreed with the Sea Mammals Research Unit (SMRU) should be carried out to determine the impact ...
This project concerns the monitoring of Little Terns during the construction phase of the Scroby Sands Offshore Windfarm. Monitoring was designed with the primary aim of assessing the impact of the proposed wind farm upon Little Terns. The work was divided into following areas: feeding studies, bree...
This document was prepared by Entec UK Limited. The report was submitted in support of the proposed Teesside Offshore Wind Farm development and provides an extensive assessment of the potential impacts of the proposed site on the surrounding area.
A survey of the intertidal zone of the proposed Kentish Flats Wind Farm cable landfall area was undertaken by Emu Ltd on behalf of Kentish Flats. The survey is part of the specifications for the site environmental management plan through the pre-construction phase as outlined by FEPA licence conditi...
As part of the monitoring programme stipulated within the FEPA Licence for the construction of a 129MW offshore wind farm on the Kentish Flats, Thames Estuary, fish monitoring surveys are required as little is known about the potential effects of wind farms in terms of enhancing or aggregating fish ...
As part of the monitoring programme stipulated within the FEPA Licence for the construction of a 129MW offshore wind farm on the Kentish Flats, Thames Estuary, fish monitoring surveys are required as little is known about the potential effects of wind farms in terms of enhancing or aggregating fish ...
As part of the monitoring programme stipulated within the FEPA Licence No. 31780/03/0 for the construction of a 30-turbine offshore wind farm on the Kentish Flats, Thames Estuary, Emu Ltd. was commissioned to undertake a pre-construction Native oyster, Ostrea edulis, sampling exercise for the collec...
In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of the Kentish Flats windfarm site to determine whether any debris has been left on the seabed or significant changes to the seabed profile have occurred as a result of the constru...
In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction surveys of the Kentish Flats wind farm site to determine whether any debris has been left on the seabed or significant changes to the seabed profile have occurred as a result of the const...
An oil and gas industry rig site survey acquired in July 2004. The block number traversed was 49/21.