Search across ocean data collections and information systems.
Enron Wind Gunfleet Ltd. (Enron Wind) have commissioned Safetec UK Ltd (Safetec) to undertake a collision risk assessment of the Gunfleet Sands area. This assessment assists to identify any concerns within the area in order that the proposed wind turbine locations and cable laying / routing can be p...
The environmental statement has been prepared by the developer SeaScape Energy Ltd on behalf of its parent companies Zilkha Renewable Energy (ZRE), enXco AS and Wind Prospect Limited (WPL) in application of the proposed Burbo Bank Offshore Wind Farm. The site of the proposed wind farm will be locate...
This environmental statement has been prepared by the developer SeaScape Energy Ltd on behalf of its parent companies Zilkha Renewable Energy (ZRE), enXco AS and Wind Prospect Limited (WPL) in application of the proposed Burbo Bank Offshore Wind Farm. The site of the proposed wind farm will be locat...
An oil and gas industry site survey for a pipeline/cable route (Cleaver Bank High to Clipper PM) acquired in March 2002. The block numbers traversed were 48/14, 48/15, 48/19, 49/11, 49/12, 49/13, 49/14 and 49/15.
An oil and gas industry site survey for a platform location acquired in July 2002. The block number traversed was 49/14.
An oil and gas industry rig site survey acquired in July 2002. The block number traversed was 49/20.
An oil and gas industry rig site survey acquired between December and January 2002. The block number traversed was 49/25.
An oil and gas industry rig site survey acquired between July and August 2002. The block number traversed was 49/26.
An oil and gas industry rig site survey acquired in March 2002. The block number traversed was 22/23.
An oil and gas industry route site survey acquired in January 2002. The block number traversed was 14/20.
Showing 2861 to 2870 of 928252 results.